Cisco SD-WAN - Part II: Manual vEdge Provision Process

Introduction

 

This chapter explains how we can provision vEdge devices manually. It starts by explaining how to build an initial system and tunnel interface configurations. Then it goes through the various certificate installation steps (CA root certificate, Certificate Signing Request (CSR), and granted certificate). After the initial configuration and certificate process section, this chapter shows how we can verify the Control Plane operation. Figure 2-1 illustrates our example topology. For simplicity, there are only two vEdge devices used in this chapter.


Figure 2-1: SD-WAN Topology.


Monday, 15 March 2021

Cisco SD-WAN: vManage, vBond, and vMSmart On-Prem Installation Process.

 



Introduction

This section explains the process how to build an on-prem Cisco Viptela based SD-WAN control plane system. It starts by setting up an enterprise Certificate Server using the Cisco CSR1000V cloud router. Next, it goes through the process of root certificate generation. The rest of the chapter explains the initial configuration and certification installation processes from vManage, vBond, and vSmart viewpoints.

Figure 1-1: Control-Plane Components Topology.